Demin Plants Case Study

Due to our expanding production needs, an Excel Water Demineralization Plant was purchased at the beginning of 2012 to cover our significant increase in production output. We then went on to purchase a further EX Power at the end of 2015.

The EX Power Demin Plants installed at Astonish

The Plant arrived on time and the installation by the Excel Water engineers was accomplished within two days. The plant was straight into production producing over 10m3 of high quality demineralised water at less than 0.3 micro siemens quality to our holding tanks per hour, which was way above our expectations in both volume and water quality.

The installation was very professionally carried out and the on-site training of the personnel involved with the running and maintenance of the plant was first class. The post technical support from Excel Water has been outstanding and their commitment to the customer has been superb.

The production of over 10m3/hr and a re-gen time of less than 30 minutes, demineralised water is now always available for our manufacturing needs.

From our experience since the introduction of the EX 100 demineralization plant, we would highly recommend this Excel Water for large quantity water treatment needs.


Steve Walker
The London Oil Refining Company
Astonish Product
www.astonishcleaners.co.uk
Bradford, West Yorkshire

Steve Walker
The London Oil Refining Company
Astonish Product
www.astonishcleaners.co.uk
Bradford, West Yorkshire

Tags: , , , , , ,

Recent Tweets